Friday, October 7, 2011

1. Our project was to take a wooded area and make it into a 150 home complex.
I learned how to make a 2-d design and sketch of a building. I didnt really like anything. I didnt like that  we didnt have enough time. I would hange the timeline so the students can go into more detail and inspire them to do better drawings.

Nathan M was the cost estimator.
Ben was the Environmental Engineer
Michael was the Health and Safety
Matt was the Health and Safety
Nathan K was the structural engineer
Sebastian Swanson was the interior designer

The environmentalist says 3 trees per house.

“I’m the structural engineer, nothing I say helps much”
-Nathan Kuhlman

For every road, there shall be a sidewalk
-Nathan K

There should be a couple acres of park total.

We will have a playground, and a soccer field.

“we need an important thing in the center”
-bower

“PINEAPPLE”
-Nathan M

Hospital i the center of town, a mall, doctors, auto shop, grocery, gas station, mc Donalds, Old country buffet, Leann Chins

150 houses needed

(50*.25)=x

x+x+x+x= 50 acres

“ERRything better fit regulation”
-Bower

“That’ll setya back about a million”
-Nathan

“I finna build some parks”

We should make sure all the buildings have an efficient set up
-me

Ben talks about his awesome idea for a three way road.

“So we’re gonna make a 2 acre school”
-Nathan

“That’s one small school”
-Bower

“What, Why”
-Nathan

No comments:

Post a Comment